HOW IT WORKS

FROM CHAOS
TO READY.

Six steps. No developer. No IT ticket. Just you, your subs, and a single place where every doc lives.

STEP 01

01

CREATE A PROJECT

Add your job site. Name it, set the address, drop in the contract dates. Takes sixty seconds.

sitereadyaudit.com / new-project

New Project

Project Name

Riverside Commons — Phase 2

Start Date

Mar 1, 2025

End Date

Sep 30, 2025

Site Address

1420 Harbor Blvd, Houston, TX

STEP 02

02

ADD YOUR SUBS

Enter each subcontractor by name and trade. No email needed yet — just build the roster.

sitereadyaudit.com / riverside-commons / subs

Subcontractors

Apex Electrical

Electrical

Active

ProSteel Fabrication

Structural

Active

Summit Plumbing

Plumbing

Pending

STEP 03

03

SEND THE LINK

One unique link per sub. They click it, upload their docs. No account. No password. No friction.

sitereadyaudit.com / invite

Send Upload Link

Apex Electrical

sitereadyaudit.com/upload/t_4x9Km2pL8

Or send via email

jose@apexelectrical.com

No account required for subs

STEP 04

04

SUBS UPLOAD IN MINUTES

COI, W-9, OSHA certs, safety plans. They drag, drop, done. You get notified automatically.

sitereadyaudit.com/upload/t_4x9Km2pL8

Apex Electrical

Upload Your Documents

Certificate of Insurance

✓ Done

COI_Apex_2025.pdf

W-9 Form

✓ Done

W9_Apex.pdf

OSHA 10 Certificate

Upload

Drag & drop or click to upload

STEP 05

05

TRACK EVERYTHING LIVE

One dashboard. Every sub. Every doc. Expiration alerts 30 days out. Nothing slips through.

sitereadyaudit.com / riverside-commons / compliance

Compliance Dashboard

1 Expiring Soon

Sub

COI

W-9

OSHA

Apex Electrical

activeactiveexpiring

ProSteel Fab

activeactiveactive

Summit Plumbing

expiredmissingmissing

STEP 06

06

EXPORT THE BINDER

Inspector shows up? One click. Your audit binder is ready — organized, labeled, complete.

sitereadyaudit.com / riverside-commons / binder

Audit Binder

Riverside Commons — Phase 2

01

Certificate of Insurance — Apex Electrical

02

W-9 — Apex Electrical

03

Certificate of Insurance — ProSteel Fab

04

OSHA 10 Certificate — ProSteel Fab

05

Subcontract Agreement — Summit Plumbing

5 documents · Inspector-ready

STAY READY

AUDIT-READY.
ALWAYS.

FREE FOREVER UNDER 3 SUBS. UPGRADE ANYTIME.

Start Free